The SoS letter on the London Plan States
Critical strategic sites have stalled, epitomised by your Development Corporation in Old Oak and Park Royal being forced to turn away £250 million of Government funding because of your inability to work successfully with the main landowner.
This is more than a little disingenuous as the money was earmarked for a CPO and the Planning Inspector stated that the scheme was unviable given the rising of industrial land values in London given that Car Giant wanted both to develop housing on their site AND be relocated in NW London – an impossible circle to square.
Given the HS2 decision Car Giant are simply the wrong use on the wrong piece of land. At the time of the Olympics central and local government worked together and moved the awkward squad, notably one very loud salmon processor. Similar joint working is notable by its absence here as for political reasons cooperation with the Mayor of London had ceased. The SoS is to blame.
Where to go – well there is a whole grid square in Basildon marked for urban intensification, but where land of similar size could be economically developed at 5-6 times the density in London. A deal is to be done if Homes England a. thought strategically and b. were directed strategically by the SoS.